ChargePoint
B+23,913
Sites
81
Avg kW
Reliability Distribution
A: 2%
B: 3%
C: 1%
Sites
Kerrville, TX
7kW max
Kerrville, TX
7kW max
Ingram, TX
7kW max
Bandera, TX
7kW max
Bandera, TX
7kW max
Winnipeg, MB
7kW max
Brandon, MB
7kW max
Brandon, MB
7kW max
Dickinson, ND
12kW max
Cambridge, NE
7kW max
Childress, TX
7kW max
Fredericksburg, TX
7kW max
Kerrville, TX
56kW avg
50kW max
Kerrville, TX
50kW max
Kerrville, TX
7kW max
San Antonio, TX
88kW avg
63kW max
Boerne, TX
63kW max
Boerne, TX
125kW max
San Antonio, TX
7kW max
San Antonio, TX
7kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| KERRVILLE PUB NATURE CNTR1 (Kerrville, TX) | — | 7 | — | ||
| GREENHILLS STATION (Kerrville, TX) | — | 7 | — | ||
| KERRVILLE PUB POINT THEATRE 1 (Ingram, TX) | — | 7 | — | ||
| BEC BANDERA UMC (Bandera, TX) | — | 7 | — | ||
| BEC BANDERA BW (Bandera, TX) | — | 7 | — | ||
| 585 MANDALAY 585 MANDALAY (Winnipeg, MB) | — | 7 | — | ||
| FORMAN MAZDA FORMAN MAZDA (Brandon, MB) | — | 7 | — | ||
| BROADSTREET ASPEN (Brandon, MB) | — | 7 | — | ||
| DPM DELIVERY BAY (Dickinson, ND) | — | 12 | — | ||
| CAMBCOBBLESTONE STATION 1 (Cambridge, NE) | — | 7 | — | ||
| NDO CHILDRESS OFFIC (Childress, TX) | — | 7 | — | ||
| DIETZDISTILLERY DAS PEACH HAUS (Fredericksburg, TX) | — | 7 | — | ||
| A | KERRVILLE PUB VISITOR CENTER (Kerrville, TX) | 56 | 50 | — | |
| KV MAIN CAMPUS KV RETAIL DC 2 (Kerrville, TX) | — | 50 | — | ||
| KV MAIN CAMPUS KV RETAIL L2 (Kerrville, TX) | — | 7 | — | ||
| A | SLUMBER PASS EX BIG'S 210 (San Antonio, TX) | 88 | 63 | — | |
| GENESIS CPE250.1 (Boerne, TX) | — | 63 | — | ||
| GENESIS CPE250.2 (Boerne, TX) | — | 125 | — | ||
| BOB'S EV 1 STATION 01 (San Antonio, TX) | — | 7 | — | ||
| MIRAVISTA MV-1 (San Antonio, TX) | — | 7 | — |