ChargePoint
B+29,824
Sites
79
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
120kW max
San Diego, CA
80kW max
San Diego, CA
49kW avg
50kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
Richland, WA
60kW avg
63kW max
Condon, OR
7kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| FBO STATION ONE FBO STATION1 (San Diego, CA) | — | 7 | — | ||
| IRVINE CO OFC CRTP 9450 0 (San Diego, CA) | — | 7 | — | ||
| TERADATA (San Diego, CA) | — | 7 | — | ||
| TERADATA AE1 (San Diego, CA) | — | 7 | — | ||
| KEARNY PEARSON POWER LINK 2 (San Diego, CA) | — | 120 | — | ||
| KEARNY PEARSON POWER LINK 1 (San Diego, CA) | — | 80 | — | ||
| A | G&M OIL CHEVRON #161 (San Diego, CA) | 49 | 50 | — | |
| SORRENTORIDGE STATION (San Diego, CA) | — | 7 | — | ||
| IKEA USA SAN DIEGO (San Diego, CA) | — | 7 | — | ||
| UCSD CP-GRNWICH 1 (San Diego, CA) | — | 7 | — | ||
| TWENTY BY SIX ONE PACIFIC HT (San Diego, CA) | — | 7 | — | ||
| IRVINE CO OFC CENTERSIDE 0 (San Diego, CA) | — | 7 | — | ||
| NORTHSTAR MGMT SHOREHAM (San Diego, CA) | — | 7 | — | ||
| DGS OSPC OHIO ST (San Diego, CA) | — | 7 | — | ||
| DGS ILLINOIS ST 1 (San Diego, CA) | — | 7 | — | ||
| LSCA LOT O (San Diego, CA) | — | 7 | — | ||
| LSCA LOT D 4 (San Diego, CA) | — | 7 | — | ||
| MISSION BREWERY MBP P1 (San Diego, CA) | — | 7 | — | ||
| B | DC RICHLAND (Richland, WA) | 60 | 63 | — | |
| COLUMBIA BASIN CONDON (Condon, OR) | — | 7 | — |