ChargePoint
B+30,850
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Riverside, CA
7kW max
Riverside, CA
7kW max
Riverside, CA
7kW max
Riverside, CA
7kW max
San Luis Obispo, CA
7kW max
San Luis Obispo, CA
7kW max
Riverside, CA
7kW max
Orange, CA
8kW max
Riverside, CA
7kW max
Riverside, CA
7kW max
Riverside, CA
7kW max
Perrysburg, OH
7kW max
Forest Lake, MN
12kW max
Goodyear, AZ
7kW max
Barnstable, MA
7kW max
Burlington Township, NJ
12kW max
Windsor, ON
12kW max
Windsor, ON
12kW max
Windsor, ON
12kW max
Bolton, MA
4kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| UC RIVERSIDE LOT 24 STATION (Riverside, CA) | — | 7 | 07 Mar | ||
| UC RIVERSIDE LOT 1 STATION 2 (Riverside, CA) | — | 7 | 07 Mar | ||
| UC RIVERSIDE LOT (Riverside, CA) | — | 7 | 07 Mar | ||
| UC RIVERSIDE LOT 1 STATION (Riverside, CA) | — | 7 | 07 Mar | ||
| CITY OF SLO CADPS 9 (San Luis Obispo, CA) | — | 7 | 07 Mar | ||
| CITY OF SLO CAD (San Luis Obispo, CA) | — | 7 | 07 Mar | ||
| UC RIVERSIDE LOT 15 STAT (Riverside, CA) | — | 7 | 07 Mar | ||
| MAIN PLACE 187 (Orange, CA) | — | 8 | 07 Mar | ||
| UC RIVERSIDE LOT 6 STATION (Riverside, CA) | — | 7 | 07 Mar | ||
| UC RIVERSIDE LOT 20 STATION1 (Riverside, CA) | — | 7 | 07 Mar | ||
| UC RIVERSIDE BS2 STATION (Riverside, CA) | — | 7 | 07 Mar | ||
| THS LEVIS (Perrysburg, OH) | — | 7 | 07 Mar | ||
| FOREST LAKE SER FOR SVR (Forest Lake, MN) | — | 12 | 07 Mar | ||
| ARREBOL VILLAS EV CHARGER 2 (Goodyear, AZ) | — | 7 | 07 Mar | ||
| MASS AUDUBON LONG PASTURE #1 (Barnstable, MA) | — | 7 | 07 Mar | ||
| FFITPSLANCASTER CHARGER (Burlington Township, NJ) | — | 12 | 09 Mar | ||
| NEXTSTAR C-38 (Windsor, ON) | — | 12 | 09 Mar | ||
| NEXTSTAR (Windsor, ON) | — | 12 | 09 Mar | ||
| NEXTSTAR N (Windsor, ON) | — | 12 | 09 Mar | ||
| ALTA NASHOBA (Bolton, MA) | — | 4 | 09 Mar |