ChargePoint
B+30,823
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Tucson, AZ
7kW max
Hialeah, FL
7kW max
Hollister, CA
7kW max
El Mirage, AZ
7kW max
Denver, CO
7kW max
Denver, CO
7kW max
Denver, CO
7kW max
Denver, CO
7kW max
Denver, CO
7kW max
Alma, NE
13kW max
Fredericksburg, VA
12kW max
Charlottesville, VA
7kW max
Fairfax, VA
7kW max
Fredericksburg, VA
19kW max
Manassas, VA
7kW max
Harrisonburg, VA
179kW avg
200kW max
Lake Ridge, VA
7kW max
Harrisonburg, VA
180kW avg
200kW max
Waynesboro, VA
7kW max
Manassas, VA
7kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| THE LOFT CINEMA SOUTH CHARGER (Tucson, AZ) | — | 7 | 04 Nov | ||
| METRO GRANDE I CHARGER (Hialeah, FL) | — | 7 | 04 Nov | ||
| HOLLISTER-PW COH STATION 1 (Hollister, CA) | — | 7 | 04 Nov | ||
| MICROSOFT PHX86-0 (El Mirage, AZ) | — | 7 | 04 Nov | ||
| HARVARD GULCH (Denver, CO) | — | 7 | 04 Nov | ||
| CCD CHARGING JUSTICE CENTER (Denver, CO) | — | 7 | 04 Nov | ||
| CCD CHARGING ACME LOT (Denver, CO) | — | 7 | 04 Nov | ||
| DPAC GARAGE 2 PERFRMNG ARTS 2 (Denver, CO) | — | 7 | 04 Nov | ||
| CCD CHARGING BANNOCK LOT 1 (Denver, CO) | — | 7 | 04 Nov | ||
| CITY OF ALMA ALMA BAY 1/2 (Alma, NE) | — | 13 | 04 Nov | ||
| USPA AFPQO000001JHLT (Fredericksburg, VA) | — | 12 | 04 Nov | ||
| PVCC (Charlottesville, VA) | — | 7 | 04 Nov | ||
| FAIRFAX COUNTY MONUMENT PG (Fairfax, VA) | — | 7 | 04 Nov | ||
| PUBLISHER (Fredericksburg, VA) | — | 19 | 04 Nov | ||
| GEORGE MASON U HYLTON LOT (Manassas, VA) | — | 7 | 04 Nov | ||
| A | HWY81TRUCKSTOP POWER LINK 1 (Harrisonburg, VA) | 179 | 200 | 04 Nov | |
| WLR STATION 1 WLR EV (Lake Ridge, VA) | — | 7 | 04 Nov | ||
| A | HWY81TRUCKSTOP POWER LINK (Harrisonburg, VA) | 180 | 200 | 04 Nov | |
| BLUE RIDGE CHILDRENSMUSEUM (Waynesboro, VA) | — | 7 | 04 Nov | ||
| 1800 CLUBHOUSE CLUB (Manassas, VA) | — | 7 | 04 Nov |