ChargePoint
B+30,830
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Orange, CA
15kW max
Thousand Oaks, CA
7kW max
Las Cruces, NM
7kW max
Las Cruces, NM
7kW max
Las Cruces, NM
7kW max
Las Cruces, NM
7kW max
Montezuma, GA
160kW max
Palo Alto, CA
7kW max
Half Moon Bay, CA
7kW max
Gilbert, AZ
12kW max
St. George, UT
7kW max
San Diego, CA
7kW max
El Cajon, CA
7kW max
San Diego, CA
7kW max
El Cajon, CA
7kW max
San Diego, CA
7kW max
San Diego, CA
7kW max
Tucson, AZ
7kW max
El Paso, TX
7kW max
Seguin, TX
125kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| UC UCIMC TRIANGLE LOT 0 (Orange, CA) | — | 15 | 02 Mar | ||
| 2000 CORPORATE 2000 CCD (Thousand Oaks, CA) | — | 7 | 02 Mar | ||
| WILLOW SPRINGS 2100 BLOCK 1 (Las Cruces, NM) | — | 7 | 04 Mar | ||
| WILLOW SPRINGS MARYS PARK (Las Cruces, NM) | — | 7 | 04 Mar | ||
| WILLOW SPRINGS 2100 BLOCK 2 (Las Cruces, NM) | — | 7 | 04 Mar | ||
| WILLOW SPRINGS 1300 BLOCK (Las Cruces, NM) | — | 7 | 04 Mar | ||
| GEORGIA POWER MONTEZUMA DC (Montezuma, GA) | — | 160 | 04 Mar | ||
| EV (Palo Alto, CA) | — | 7 | 04 Mar | ||
| 719 MAIN ST UNIT A (Half Moon Bay, CA) | — | 7 | 04 Mar | ||
| BROWN 1 CPF 2 (Gilbert, AZ) | — | 12 | 04 Mar | ||
| SCO W.F.CLINIC (St. George, UT) | — | 7 | 04 Mar | ||
| SOCIETY BRADBURY 2 (San Diego, CA) | — | 7 | 06 Mar | ||
| CECCH A (El Cajon, CA) | — | 7 | 06 Mar | ||
| SOCIETY FELIX 7 (San Diego, CA) | — | 7 | 06 Mar | ||
| CECPW PW A03 A04 (El Cajon, CA) | — | 7 | 06 Mar | ||
| SOCIETY MARGO6 (San Diego, CA) | — | 7 | 06 Mar | ||
| SOCIETY MARGO5 (San Diego, CA) | — | 7 | 06 Mar | ||
| RANCHO CNTR INV RANCHO C (Tucson, AZ) | — | 7 | 06 Mar | ||
| TTUHSC MSBII STATION 1 (El Paso, TX) | — | 7 | 06 Mar | ||
| HALFTIME 3 STATION (Seguin, TX) | — | 125 | 06 Mar |