Metairie, LA
Average peak power unavailable
63 kW maximum
First tracked Sep 9, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Metairie, LA
Average peak power unavailable
63 kW maximum
First tracked Sep 9, 2026
Fort Pierce, FL
Average peak power unavailable
24 kW maximum
First tracked Sep 9, 2026
Victorville, CA
Average peak power unavailable
19 kW maximum
First tracked Sep 9, 2026
Victorville, CA
Average peak power unavailable
19 kW maximum
First tracked Sep 9, 2026
Lancaster, PA
Average peak power unavailable
22 kW maximum
First tracked Sep 9, 2026
Mansfield, CT
Average peak power unavailable
63 kW maximum
First tracked Sep 9, 2026
Victorville, CA
Average peak power unavailable
19 kW maximum
First tracked Sep 9, 2026
McDonough, GA
Average peak power unavailable
63 kW maximum
First tracked Sep 9, 2026
Eagle, ID
Average peak power unavailable
22 kW maximum
First tracked Sep 10, 2026
Edmonton, AB
Average peak power unavailable
19 kW maximum
First tracked Sep 10, 2026
Moline, IL
Average peak power unavailable
19 kW maximum
First tracked Sep 10, 2026
Mountain View, CA
Average peak power unavailable
19 kW maximum
First tracked Sep 10, 2026
Boston, MA
Average peak power unavailable
50 kW maximum
First tracked Sep 10, 2026
Concord, MA
Average peak power unavailable
19 kW maximum
First tracked Sep 11, 2026
Robbinsdale, MN
Average peak power unavailable
63 kW maximum
First tracked Sep 14, 2026
Chantilly, VA
Average peak power unavailable
19 kW maximum
First tracked Sep 14, 2026
Ames, IA
Average peak power unavailable
80 kW maximum
First tracked Sep 15, 2026
Seattle, WA
Average peak power unavailable
125 kW maximum
First tracked Sep 15, 2026
Huntsville, AL
62 kW avg peak
63 kW maximum
First tracked Sep 15, 2026
Chantilly, VA
Average peak power unavailable
19 kW maximum
First tracked Sep 15, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
4425 4425
Metairie, LA
Operational First tracked Sep 9, 2026 |
Operational | — | 63 kW | Sep 9, 2026 |
|
BEV SMITH TOYOT
Fort Pierce, FL
Operational First tracked Sep 9, 2026 |
Operational | — | 24 kW | Sep 9, 2026 |
|
VVC EC SOUTH 03
Victorville, CA
Operational First tracked Sep 9, 2026 |
Operational | — | 19 kW | Sep 9, 2026 |
|
VVC EC NORTH 05
Victorville, CA
Operational First tracked Sep 9, 2026 |
Operational | — | 19 kW | Sep 9, 2026 |
|
LGH JAMES ST EV 05
Lancaster, PA
Unknown First tracked Sep 9, 2026 |
Unknown | — | 22 kW | Sep 9, 2026 |
|
UCONN STORRS DSFC 1
Mansfield, CT
Operational First tracked Sep 9, 2026 |
Operational | — | 63 kW | Sep 9, 2026 |
|
VVC SFC 0
Victorville, CA
Operational First tracked Sep 9, 2026 |
Operational | — | 19 kW | Sep 9, 2026 |
|
MBAS MCDONOUGH
McDonough, GA
Unknown First tracked Sep 9, 2026 |
Unknown | — | 63 kW | Sep 9, 2026 |
|
HC COMPANY OFFI EAGLE 7 CHARGER
Eagle, ID
Operational First tracked Sep 10, 2026 |
Operational | — | 22 kW | Sep 10, 2026 |
|
BROADSTREET CHAPPELLE #2
Edmonton, AB
Operational First tracked Sep 10, 2026 |
Operational | — | 19 kW | Sep 10, 2026 |
|
LOUFUSZKIAOFMOL
Moline, IL
Operational First tracked Sep 10, 2026 |
Operational | — | 19 kW | Sep 10, 2026 |
|
GOOGLE MTV-46-52
Mountain View, CA
Operational First tracked Sep 10, 2026 |
Operational | — | 19 kW | Sep 10, 2026 |
|
421 PARK DC SPOT 1
Boston, MA
Operational First tracked Sep 10, 2026 |
Operational | — | 50 kW | Sep 10, 2026 |
|
FIELD HOUSE STATION 1
Concord, MA
Operational First tracked Sep 11, 2026 |
Operational | — | 19 kW | Sep 11, 2026 |
|
ROBBINSDALECITY CITY HALL
Robbinsdale, MN
Operational First tracked Sep 14, 2026 |
Operational | — | 63 kW | Sep 14, 2026 |
|
FAIRFAX COUNTY SULLY GC
Chantilly, VA
Operational First tracked Sep 14, 2026 |
Operational | — | 19 kW | Sep 14, 2026 |
|
AMES EV DC
Ames, IA
Operational First tracked Sep 15, 2026 |
Operational | — | 80 kW | Sep 15, 2026 |
|
CITY LIGHT N BEACON HILL
Seattle, WA
Operational First tracked Sep 15, 2026 |
Operational | — | 125 kW | Sep 15, 2026 |
|
MBHUNTSVILLE DC FAST CHARGER
Huntsville, AL Reliability A Operational First tracked Sep 15, 2026 |
Operational | 62 kW | 63 kW | Sep 15, 2026 |
|
FAIRFAX COUNTY SULLY GC
Chantilly, VA
Operational First tracked Sep 15, 2026 |
Operational | — | 19 kW | Sep 15, 2026 |