Whitewater, WI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Whitewater, WI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Whitewater, WI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Whitewater, WI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
White Bear Lake, MN
Average peak power unavailable
8 kW maximum
First tracked Jul 17, 2026
Atlanta, GA
Average peak power unavailable
500 kW maximum
First tracked Jul 17, 2026
West Palm Beach, FL
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
Pawtucket, RI
Average peak power unavailable
19 kW maximum
First tracked Jul 17, 2026
White Bear Lake, MN
Average peak power unavailable
10 kW maximum
First tracked Jul 17, 2026
Silver Spring, MD
Average peak power unavailable
19 kW maximum
First tracked Jul 18, 2026
Hastings, MN
Average peak power unavailable
19 kW maximum
First tracked Jul 18, 2026
Hastings, MN
Average peak power unavailable
19 kW maximum
First tracked Jul 18, 2026
Hastings, MN
Average peak power unavailable
19 kW maximum
First tracked Jul 18, 2026
Charleston, OR
Average peak power unavailable
15 kW maximum
First tracked Jul 18, 2026
Akron, OH
Average peak power unavailable
63 kW maximum
First tracked Jul 20, 2026
Denver, CO
78 kW avg peak
125 kW maximum
First tracked Jul 21, 2026
Denver, CO
Average peak power unavailable
125 kW maximum
First tracked Jul 21, 2026
Buffalo, NY
Average peak power unavailable
250 kW maximum
First tracked Jul 21, 2026
York, PA
Average peak power unavailable
19 kW maximum
First tracked Jul 22, 2026
Brampton, ON
Average peak power unavailable
500 kW maximum
First tracked Jul 23, 2026
Toronto, ON
Average peak power unavailable
500 kW maximum
First tracked Jul 23, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
EVCP 1 LOT 2
Whitewater, WI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
EVCP 1 LOT 19
Whitewater, WI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
EVCP 1 LOT 2
Whitewater, WI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
LUNDS FOODS WHITE BEAR-1
White Bear Lake, MN
Operational First tracked Jul 17, 2026 |
Operational | — | 8 kW | Jul 17, 2026 |
|
DELTA AIR LINES DCFC BLDG
Atlanta, GA
Operational First tracked Jul 17, 2026 |
Operational | — | 500 kW | Jul 17, 2026 |
|
CASA MARA BLDG4 BUILDING 2 ST 1
West Palm Beach, FL
Unknown First tracked Jul 17, 2026 |
Unknown | — | 19 kW | Jul 17, 2026 |
|
COLLETTE TRAVEL COLLETTEUPPER1
Pawtucket, RI
Operational First tracked Jul 17, 2026 |
Operational | — | 19 kW | Jul 17, 2026 |
|
WALSER AUTO FRONT LOT
White Bear Lake, MN
Operational First tracked Jul 17, 2026 |
Operational | — | 10 kW | Jul 17, 2026 |
|
WSSC CONS LAB 1
Silver Spring, MD
Operational First tracked Jul 18, 2026 |
Operational | — | 19 kW | Jul 18, 2026 |
|
WASH. COUNTY ST CROIX BLUFFS
Hastings, MN
Operational First tracked Jul 18, 2026 |
Operational | — | 19 kW | Jul 18, 2026 |
|
WASH. COUNTY ST CROIX BLUFFS
Hastings, MN
Operational First tracked Jul 18, 2026 |
Operational | — | 19 kW | Jul 18, 2026 |
|
WASH. COUNTY ST CROIX BLUFFS
Hastings, MN
Operational First tracked Jul 18, 2026 |
Operational | — | 19 kW | Jul 18, 2026 |
|
VC 1 SSNERR EV
Charleston, OR
Operational First tracked Jul 18, 2026 |
Operational | — | 15 kW | Jul 18, 2026 |
|
AKRON METRO RTA METRO PUBLIC DC
Akron, OH
Operational First tracked Jul 20, 2026 |
Operational | — | 63 kW | Jul 20, 2026 |
|
QT CHARGERS 4246 STATION 1
Denver, CO Reliability B Operational First tracked Jul 21, 2026 |
Operational | 78 kW | 125 kW | Jul 21, 2026 |
|
QT CHARGERS 4204 STATION 2
Denver, CO
Operational First tracked Jul 21, 2026 |
Operational | — | 125 kW | Jul 21, 2026 |
|
OPTIMUS ENERGY WILLIAMSVLL DC
Buffalo, NY
Operational First tracked Jul 21, 2026 |
Operational | — | 250 kW | Jul 21, 2026 |
|
LEG UP CHARGE LEG UP CHARGE 1
York, PA
Operational First tracked Jul 22, 2026 |
Operational | — | 19 kW | Jul 22, 2026 |
|
PETRO-CANADA CP 35017 - 1
Brampton, ON
Operational First tracked Jul 23, 2026 |
Operational | — | 500 kW | Jul 23, 2026 |
|
PETRO-CANADA 59222
Toronto, ON
Operational First tracked Jul 23, 2026 |
Operational | — | 500 kW | Jul 23, 2026 |