Epping, NH
Average peak power unavailable
125 kW maximum
First tracked May 2, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Epping, NH
Average peak power unavailable
125 kW maximum
First tracked May 2, 2026
Framingham, MA
Average peak power unavailable
19 kW maximum
First tracked May 2, 2026
Needham, MA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Wapato, WA
Average peak power unavailable
8 kW maximum
First tracked May 2, 2026
Sequim, WA
Average peak power unavailable
12 kW maximum
First tracked May 2, 2026
Spokane Valley, WA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Mississauga, ON
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Woodstock, ON
Average peak power unavailable
15 kW maximum
First tracked May 2, 2026
Mississauga, ON
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Vancouver, BC
Average peak power unavailable
63 kW maximum
First tracked May 2, 2026
Campbell River, BC
Average peak power unavailable
10 kW maximum
First tracked May 2, 2026
Vancouver, BC
Average peak power unavailable
120 kW maximum
First tracked May 2, 2026
Edmonton, AB
Average peak power unavailable
35 kW maximum
First tracked May 2, 2026
Camrose, AB
Average peak power unavailable
12 kW maximum
First tracked May 2, 2026
Edmonton, AB
Average peak power unavailable
40 kW maximum
First tracked May 2, 2026
Greencastle, PA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Contrecoeur, QC
Average peak power unavailable
200 kW maximum
First tracked May 2, 2026
Fort Lauderdale, FL
Average peak power unavailable
12 kW maximum
First tracked May 4, 2026
San Marcos, CA
Average peak power unavailable
8 kW maximum
First tracked May 4, 2026
Miami, FL
Average peak power unavailable
7 kW maximum
First tracked May 4, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
REVISION ENERGY
Epping, NH
Operational First tracked May 2, 2026 |
Operational | — | 125 kW | May 2, 2026 |
|
FSU SALEM END MAPLE ST LOT 1
Framingham, MA
Operational First tracked May 2, 2026 |
Operational | — | 19 kW | May 2, 2026 |
|
ROSEMARY RIDGE STATION 1
Needham, MA
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
WAPATO 1 1
Wapato, WA
Operational First tracked May 2, 2026 |
Operational | — | 8 kW | May 2, 2026 |
|
SALISH SEASONS
Sequim, WA
Operational First tracked May 2, 2026 |
Operational | — | 12 kW | May 2, 2026 |
|
LL THERAPY LLCFT
Spokane Valley, WA
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
CAWTHRA CC CAWTHRA CC
Mississauga, ON
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
WOODSTOCKTOYOTA FRONT SHOP
Woodstock, ON
Operational First tracked May 2, 2026 |
Operational | — | 15 kW | May 2, 2026 |
|
REXEL CORPORATE REXEL
Mississauga, ON
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
MBB-CHARGEPOINT CPE
Vancouver, BC
Operational First tracked May 2, 2026 |
Operational | — | 63 kW | May 2, 2026 |
|
BROADSTREET CEDAR
Campbell River, BC
Operational First tracked May 2, 2026 |
Operational | — | 10 kW | May 2, 2026 |
|
MBB-CHARGEPOINT CPE PLUS
Vancouver, BC
Operational First tracked May 2, 2026 |
Operational | — | 120 kW | May 2, 2026 |
|
FREEDOM FORD CHARGER
Edmonton, AB
Operational First tracked May 2, 2026 |
Operational | — | 35 kW | May 2, 2026 |
|
CAMROSE TOYOTA CAMROSE 2
Camrose, AB
Operational First tracked May 2, 2026 |
Operational | — | 12 kW | May 2, 2026 |
|
WATERLOO FORD CHARGER
Edmonton, AB
Unknown First tracked May 2, 2026 |
Unknown | — | 40 kW | May 2, 2026 |
|
COMMERCE AVE STATION 6
Greencastle, PA
Unknown First tracked May 2, 2026 |
Unknown | — | 7 kW | May 2, 2026 |
|
RECHARGECO CONTRECŒUR 02
Contrecoeur, QC
Operational First tracked May 2, 2026 |
Operational | — | 200 kW | May 2, 2026 |
|
THE ARCADIAN 31
Fort Lauderdale, FL
Operational First tracked May 4, 2026 |
Operational | — | 12 kW | May 4, 2026 |
|
MERIDIAN MERIDIAN
San Marcos, CA
Unknown First tracked May 4, 2026 |
Unknown | — | 8 kW | May 4, 2026 |
|
OBE EVIS-1
Miami, FL
Operational First tracked May 4, 2026 |
Operational | — | 7 kW | May 4, 2026 |