Morrisville, NC
Average peak power unavailable
7 kW maximum
First tracked Apr 23, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Morrisville, NC
Average peak power unavailable
7 kW maximum
First tracked Apr 23, 2026
Lathrop, CA
Average peak power unavailable
7 kW maximum
First tracked Apr 23, 2026
Concord, CA
Average peak power unavailable
13 kW maximum
First tracked Apr 23, 2026
Orleans, MA
Average peak power unavailable
7 kW maximum
First tracked Apr 23, 2026
Orleans, MA
Average peak power unavailable
7 kW maximum
First tracked Apr 23, 2026
Austin, TX
Average peak power unavailable
8 kW maximum
First tracked Apr 24, 2026
Fort Lauderdale, FL
Average peak power unavailable
8 kW maximum
First tracked Apr 24, 2026
Hialeah, FL
Average peak power unavailable
7 kW maximum
First tracked Apr 24, 2026
Los Angeles, CA
Average peak power unavailable
19 kW maximum
First tracked Apr 24, 2026
Fountain Inn, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 24, 2026
Taylors, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 24, 2026
Spartanburg, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 24, 2026
Piedmont, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 24, 2026
Travelers Rest, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 24, 2026
Inman, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 24, 2026
Raleigh, NC
Average peak power unavailable
7 kW maximum
First tracked Apr 24, 2026
Cary, NC
Average peak power unavailable
7 kW maximum
First tracked Apr 24, 2026
Thornton, CO
Average peak power unavailable
8 kW maximum
First tracked Apr 24, 2026
Seekonk, MA
Average peak power unavailable
10 kW maximum
First tracked Apr 24, 2026
Parma Heights, OH
Average peak power unavailable
7 kW maximum
First tracked Apr 24, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
808 HAWTHORNERP EV
Morrisville, NC
Operational First tracked Apr 23, 2026 |
Operational | — | 7 kW | Apr 23, 2026 |
|
TRU STATION 1 STATION 1
Lathrop, CA
Operational First tracked Apr 23, 2026 |
Operational | — | 7 kW | Apr 23, 2026 |
|
2600 STANWELL STATION 1
Concord, CA
Operational First tracked Apr 23, 2026 |
Operational | — | 13 kW | Apr 23, 2026 |
|
CAPE COD 5 ORLEANS
Orleans, MA
Operational First tracked Apr 23, 2026 |
Operational | — | 7 kW | Apr 23, 2026 |
|
CAPE COD 5 ORLEANS 1
Orleans, MA
Operational First tracked Apr 23, 2026 |
Operational | — | 7 kW | Apr 23, 2026 |
|
600 CONGRESS EV 5
Austin, TX
Operational First tracked Apr 24, 2026 |
Operational | — | 8 kW | Apr 24, 2026 |
|
THE ARCADIAN
Fort Lauderdale, FL
Operational First tracked Apr 24, 2026 |
Operational | — | 8 kW | Apr 24, 2026 |
|
HQ STATION CT4023
Hialeah, FL
Operational First tracked Apr 24, 2026 |
Operational | — | 7 kW | Apr 24, 2026 |
|
U.S. REIF 6300 CP6K
Los Angeles, CA
Operational First tracked Apr 24, 2026 |
Operational | — | 19 kW | Apr 24, 2026 |
|
OPTIMUS CPO BTC FOUNTAIN
Fountain Inn, SC
Operational First tracked Apr 24, 2026 |
Operational | — | 350 kW | Apr 24, 2026 |
|
OPTIMUS CPO BTC TAYLORS
Taylors, SC
Operational First tracked Apr 24, 2026 |
Operational | — | 350 kW | Apr 24, 2026 |
|
OPTIMUS CPO BTC WOFFRDCLLG1
Spartanburg, SC
Operational First tracked Apr 24, 2026 |
Operational | — | 350 kW | Apr 24, 2026 |
|
OPTIMUS CPO BTC PIEDMONT
Piedmont, SC
Operational First tracked Apr 24, 2026 |
Operational | — | 350 kW | Apr 24, 2026 |
|
OPTIMUS CPO BTC TRAVLRSRST
Travelers Rest, SC
Operational First tracked Apr 24, 2026 |
Operational | — | 350 kW | Apr 24, 2026 |
|
OPTIMUS CPO BTC INMAN
Inman, SC
Operational First tracked Apr 24, 2026 |
Operational | — | 350 kW | Apr 24, 2026 |
|
HIGHWOODS RTP TOWER
Raleigh, NC
Operational First tracked Apr 24, 2026 |
Operational | — | 7 kW | Apr 24, 2026 |
|
SAS INSTITUTE BLDG Q
Cary, NC
Operational First tracked Apr 24, 2026 |
Operational | — | 7 kW | Apr 24, 2026 |
|
K1 SPEED K1 SPEED
Thornton, CO
Operational First tracked Apr 24, 2026 |
Operational | — | 8 kW | Apr 24, 2026 |
|
DARLINGGROUP EV
Seekonk, MA
Operational First tracked Apr 24, 2026 |
Operational | — | 10 kW | Apr 24, 2026 |
|
CCPLWVH1 CCPLPAH1
Parma Heights, OH
Operational First tracked Apr 24, 2026 |
Operational | — | 7 kW | Apr 24, 2026 |