Alpharetta, GA
Average peak power unavailable
12 kW maximum
First tracked Apr 18, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Alpharetta, GA
Average peak power unavailable
12 kW maximum
First tracked Apr 18, 2026
Muskegon, MI
Average peak power unavailable
63 kW maximum
First tracked Apr 18, 2026
Beverly, MA
Average peak power unavailable
7 kW maximum
First tracked Apr 18, 2026
Amherst, MA
Average peak power unavailable
7 kW maximum
First tracked Apr 18, 2026
Amherst, MA
Average peak power unavailable
7 kW maximum
First tracked Apr 18, 2026
Richmond, BC
Average peak power unavailable
4 kW maximum
First tracked Apr 18, 2026
Gig Harbor, WA
Average peak power unavailable
8 kW maximum
First tracked Apr 18, 2026
Richmond, BC
Average peak power unavailable
4 kW maximum
First tracked Apr 18, 2026
Grand Blanc, MI
Average peak power unavailable
19 kW maximum
First tracked Apr 18, 2026
Penticton, BC
Average peak power unavailable
7 kW maximum
First tracked Apr 18, 2026
Montréal, QC
Average peak power unavailable
200 kW maximum
First tracked Apr 19, 2026
Latta, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 20, 2026
Miami, FL
Average peak power unavailable
8 kW maximum
First tracked Apr 20, 2026
Vashon, WA
Average peak power unavailable
7 kW maximum
First tracked Apr 20, 2026
Hamer, SC
88 kW avg peak
350 kW maximum
First tracked Apr 21, 2026
San Diego, CA
Average peak power unavailable
8 kW maximum
First tracked Apr 21, 2026
Mountain View, CA
Average peak power unavailable
8 kW maximum
First tracked Apr 21, 2026
Tucson, AZ
Average peak power unavailable
7 kW maximum
First tracked Apr 21, 2026
Atmore, AL
115 kW avg peak
200 kW maximum
First tracked Apr 21, 2026
Tallahassee, FL
150 kW avg peak
200 kW maximum
First tracked Apr 21, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
POPE&LAND 3000 SUMMIT PL
Alpharetta, GA
Operational First tracked Apr 18, 2026 |
Operational | — | 12 kW | Apr 18, 2026 |
|
AMITY COMMONS
Muskegon, MI
Operational First tracked Apr 18, 2026 |
Operational | — | 63 kW | Apr 18, 2026 |
|
AMPHENOL STATION
Beverly, MA
Operational First tracked Apr 18, 2026 |
Operational | — | 7 kW | Apr 18, 2026 |
|
UMASS AMHERST LOT 22 L19
Amherst, MA
Unknown First tracked Apr 18, 2026 |
Unknown | — | 7 kW | Apr 18, 2026 |
|
UMASS AMHERST LOT 22 L20
Amherst, MA
Operational First tracked Apr 18, 2026 |
Operational | — | 7 kW | Apr 18, 2026 |
|
TOYO TIRES TOYO2
Richmond, BC
Operational First tracked Apr 18, 2026 |
Operational | — | 4 kW | Apr 18, 2026 |
|
REDAPTIVE STATION
Gig Harbor, WA
Operational First tracked Apr 18, 2026 |
Operational | — | 8 kW | Apr 18, 2026 |
|
TOYO TIRES TOYO
Richmond, BC
Operational First tracked Apr 18, 2026 |
Operational | — | 4 kW | Apr 18, 2026 |
|
GRAND BLANC GRAND BLANC TWP
Grand Blanc, MI
Operational First tracked Apr 18, 2026 |
Operational | — | 19 kW | Apr 18, 2026 |
|
TOYOTA SKAHA TOYOTA SKAHA
Penticton, BC
Operational First tracked Apr 18, 2026 |
Operational | — | 7 kW | Apr 18, 2026 |
|
RECHARGECO ST-HENRI 0
Montréal, QC
Operational First tracked Apr 19, 2026 |
Operational | — | 200 kW | Apr 19, 2026 |
|
OPTIMUS CPO BTC LATTA
Latta, SC
Operational First tracked Apr 20, 2026 |
Operational | — | 350 kW | Apr 20, 2026 |
|
OBE UNA RESID LEFT
Miami, FL
Operational First tracked Apr 20, 2026 |
Operational | — | 8 kW | Apr 20, 2026 |
|
MOM'S STATION 1
Vashon, WA
Operational First tracked Apr 20, 2026 |
Operational | — | 7 kW | Apr 20, 2026 |
|
OPTIMUS CPO BTC HAMER
Hamer, SC Reliability F Operational First tracked Apr 21, 2026 |
Operational | 88 kW | 350 kW | Apr 21, 2026 |
|
INTUIT SDG FLOOR
San Diego, CA
Operational First tracked Apr 21, 2026 |
Operational | — | 8 kW | Apr 21, 2026 |
|
INTUIT MTV 21-44 FLOOR 4
Mountain View, CA
Operational First tracked Apr 21, 2026 |
Operational | — | 8 kW | Apr 21, 2026 |
|
INTUIT INC TUCSON 6
Tucson, AZ
Operational First tracked Apr 21, 2026 |
Operational | — | 7 kW | Apr 21, 2026 |
|
OPTIMUS ENERGY CREEKS TRAVEL 2
Atmore, AL Reliability A Operational First tracked Apr 21, 2026 |
Operational | 115 kW | 200 kW | Apr 21, 2026 |
|
FLEET PFC02-PL
Tallahassee, FL Reliability B Operational First tracked Apr 21, 2026 |
Operational | 150 kW | 200 kW | Apr 21, 2026 |