Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Tulalip Bay, WA
Average peak power unavailable
8 kW maximum
First tracked Apr 17, 2026
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Marysville, WA
Average peak power unavailable
8 kW maximum
First tracked Apr 17, 2026
Pullman, WA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Pullman, WA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Spring Valley, CA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Oakland, CA
Average peak power unavailable
4 kW maximum
First tracked Apr 17, 2026
Fayetteville, GA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Lynchburg, SC
86 kW avg peak
350 kW maximum
First tracked Apr 17, 2026
Sumter, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 17, 2026
Kaysville, UT
Average peak power unavailable
13 kW maximum
First tracked Apr 17, 2026
Atlantic City, NJ
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Philadelphia, PA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Los Angeles, CA
Average peak power unavailable
7 kW maximum
First tracked Apr 18, 2026
Los Angeles, CA
Average peak power unavailable
12 kW maximum
First tracked Apr 18, 2026
Los Angeles, CA
Average peak power unavailable
7 kW maximum
First tracked Apr 18, 2026
Fayetteville, GA
Average peak power unavailable
7 kW maximum
First tracked Apr 18, 2026
Florence, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 18, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
CITY OF BOSTON MUNI LOT 15
Boston, MA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
TULALIP AD
Tulalip Bay, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 8 kW | Apr 17, 2026 |
|
MADRONA MADRONA
Bellevue, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
TULALIP AD-4
Marysville, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 8 kW | Apr 17, 2026 |
|
COP_ CITY HALL NO
Pullman, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
COP_ CITY HALL NO. 2
Pullman, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
DGS ARC 7 SPRNG VLY
Spring Valley, CA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
PARKLANE PARKLANE EV
Houston, TX
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
CPF50 REAR CPF50 REAR
Oakland, CA
Operational First tracked Apr 17, 2026 |
Operational | — | 4 kW | Apr 17, 2026 |
|
PF PARKING LOT U
Fayetteville, GA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
OPTIMUS CPO BTC LYNCHBURG
Lynchburg, SC Reliability F Operational First tracked Apr 17, 2026 |
Operational | 86 kW | 350 kW | Apr 17, 2026 |
|
OPTIMUS CPO BTC SUMTER
Sumter, SC
Operational First tracked Apr 17, 2026 |
Operational | — | 350 kW | Apr 17, 2026 |
|
DAVISTECH WELDING
Kaysville, UT
Operational First tracked Apr 17, 2026 |
Operational | — | 13 kW | Apr 17, 2026 |
|
OCR OCEAN CHARG
Atlantic City, NJ
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
PIAZZA ALTA STATION
Philadelphia, PA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
STUDIO 1260 STATION 02
Los Angeles, CA
Operational First tracked Apr 18, 2026 |
Operational | — | 7 kW | Apr 18, 2026 |
|
BCAST ASSIGNED CPF 2
Los Angeles, CA
Operational First tracked Apr 18, 2026 |
Operational | — | 12 kW | Apr 18, 2026 |
|
10UCP 9128
Los Angeles, CA
Operational First tracked Apr 18, 2026 |
Operational | — | 7 kW | Apr 18, 2026 |
|
PF PARKING LOT U S SOCCER A #1
Fayetteville, GA
Operational First tracked Apr 18, 2026 |
Operational | — | 7 kW | Apr 18, 2026 |
|
OPTIMUS CPO BTC FLORENCE
Florence, SC
Operational First tracked Apr 18, 2026 |
Operational | — | 350 kW | Apr 18, 2026 |