ChargePoint
B+23,764
Sites
81
Avg kW
Reliability Distribution
A: 2%
B: 3%
C: 1%
Sites
East Windsor, NJ
7kW max
Denver, CO
7kW max
Pennington, NJ
7kW max
A
MASSDOT
Barnstable, MA
81kW avg
320kW max
Shoreview, MN
10kW max
Boston, MA
7kW max
Tulalip Bay, WA
8kW max
Bellevue, WA
7kW max
Marysville, WA
8kW max
Pullman, WA
7kW max
Pullman, WA
7kW max
Spring Valley, CA
7kW max
Houston, TX
7kW max
Oakland, CA
4kW max
Fayetteville, GA
7kW max
Lynchburg, SC
150kW max
Sumter, SC
150kW max
Kaysville, UT
13kW max
Atlantic City, NJ
7kW max
Philadelphia, PA
7kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| HOV_EV_CHRG HOV_EV_CHRG (East Windsor, NJ) | — | 7 | 16 Apr | ||
| FH VALET P1 VALET P1 (Denver, CO) | — | 7 | 17 Apr | ||
| COLLECTION #1 COLLECTION #1 (Pennington, NJ) | — | 7 | 17 Apr | ||
| A | MASSDOT (Barnstable, MA) | 81 | 320 | 17 Apr | |
| SHOREVIEW BOBBY-THEISEN (Shoreview, MN) | — | 10 | 17 Apr | ||
| CITY OF BOSTON MUNI LOT 15 (Boston, MA) | — | 7 | 17 Apr | ||
| TULALIP AD (Tulalip Bay, WA) | — | 8 | 17 Apr | ||
| MADRONA MADRONA (Bellevue, WA) | — | 7 | 17 Apr | ||
| TULALIP AD-4 (Marysville, WA) | — | 8 | 17 Apr | ||
| COP_ CITY HALL NO (Pullman, WA) | — | 7 | 17 Apr | ||
| COP_ CITY HALL NO. 2 (Pullman, WA) | — | 7 | 17 Apr | ||
| DGS ARC 7 SPRNG VLY (Spring Valley, CA) | — | 7 | 17 Apr | ||
| PARKLANE PARKLANE EV (Houston, TX) | — | 7 | 17 Apr | ||
| CPF50 REAR CPF50 REAR (Oakland, CA) | — | 4 | 17 Apr | ||
| PF PARKING LOT U (Fayetteville, GA) | — | 7 | 17 Apr | ||
| OPTIMUS CPO BTC LYNCHBURG (Lynchburg, SC) | — | 150 | 17 Apr | ||
| OPTIMUS CPO BTC SUMTER (Sumter, SC) | — | 150 | 17 Apr | ||
| DAVISTECH WELDING (Kaysville, UT) | — | 13 | 17 Apr | ||
| OCR OCEAN CHARG (Atlantic City, NJ) | — | 7 | 17 Apr | ||
| PIAZZA ALTA STATION (Philadelphia, PA) | — | 7 | 17 Apr |