Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 30, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 30, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 31, 2026
Richmond, VA
Average peak power unavailable
13 kW maximum
First tracked Mar 31, 2026
Normal, IL
Average peak power unavailable
7 kW maximum
First tracked Mar 31, 2026
Ann Arbor, MI
Average peak power unavailable
7 kW maximum
First tracked Mar 31, 2026
Bellefonte, PA
Average peak power unavailable
7 kW maximum
First tracked Mar 31, 2026
Ipswich, MA
Average peak power unavailable
125 kW maximum
First tracked Mar 31, 2026
Thousand Oaks, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 31, 2026
Frisco, TX
Average peak power unavailable
63 kW maximum
First tracked Mar 31, 2026
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 31, 2026
Highland, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 31, 2026
Phoenix, AZ
Average peak power unavailable
350 kW maximum
First tracked Apr 1, 2026
Ontario, CA
Average peak power unavailable
19 kW maximum
First tracked Apr 1, 2026
Fairburn, GA
171 kW avg peak
250 kW maximum
First tracked Apr 1, 2026
Austin, TX
Average peak power unavailable
4 kW maximum
First tracked Apr 1, 2026
Austin, TX
Average peak power unavailable
4 kW maximum
First tracked Apr 1, 2026
Atmore, AL
115 kW avg peak
500 kW maximum
First tracked Apr 1, 2026
Cupertino, CA
Average peak power unavailable
10 kW maximum
First tracked Apr 2, 2026
Ripon, CA
142 kW avg peak
375 kW maximum
First tracked Apr 2, 2026
Manassas, VA
Average peak power unavailable
7 kW maximum
First tracked Apr 2, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
UC RIVERSIDE LOT 15 STAT 3
Riverside, CA
Operational First tracked Mar 30, 2026 |
Operational | — | 7 kW | Mar 30, 2026 |
|
UC RIVERSIDE LOT 6 STATION
Riverside, CA
Operational First tracked Mar 31, 2026 |
Operational | — | 7 kW | Mar 31, 2026 |
|
OBE EMBASSY RICHM
Richmond, VA
Operational First tracked Mar 31, 2026 |
Operational | — | 13 kW | Mar 31, 2026 |
|
ISU BONE PAYLOT BPL
Normal, IL
Operational First tracked Mar 31, 2026 |
Operational | — | 7 kW | Mar 31, 2026 |
|
PLYMOUTH BRANCH UMCU
Ann Arbor, MI
Operational First tracked Mar 31, 2026 |
Operational | — | 7 kW | Mar 31, 2026 |
|
BELLEFONTE CLIN BUCKAROO
Bellefonte, PA
Operational First tracked Mar 31, 2026 |
Operational | — | 7 kW | Mar 31, 2026 |
|
DOWNTOWN LINEBROOK DC
Ipswich, MA
Operational First tracked Mar 31, 2026 |
Operational | — | 125 kW | Mar 31, 2026 |
|
OV CAR CHARGER STATION2
Thousand Oaks, CA
Operational First tracked Mar 31, 2026 |
Operational | — | 7 kW | Mar 31, 2026 |
|
TXB #90 STATION
Frisco, TX
Operational First tracked Mar 31, 2026 |
Operational | — | 63 kW | Mar 31, 2026 |
|
MEDIA STUDIOS
Burbank, CA
Operational First tracked Mar 31, 2026 |
Operational | — | 7 kW | Mar 31, 2026 |
|
YAAMAVA' S PARKING #13
Highland, CA
Operational First tracked Mar 31, 2026 |
Operational | — | 7 kW | Mar 31, 2026 |
|
BELL RD KIA PL0
Phoenix, AZ
Operational First tracked Apr 1, 2026 |
Operational | — | 350 kW | Apr 1, 2026 |
|
ONT CITY HALL STATION
Ontario, CA
Operational First tracked Apr 1, 2026 |
Operational | — | 19 kW | Apr 1, 2026 |
|
OPTIMUS ENERGY FAIRBURN DC 0
Fairburn, GA Reliability A Operational First tracked Apr 1, 2026 |
Operational | 171 kW | 250 kW | Apr 1, 2026 |
|
SONORA
Austin, TX
Operational First tracked Apr 1, 2026 |
Operational | — | 4 kW | Apr 1, 2026 |
|
SONORA
Austin, TX
Operational First tracked Apr 1, 2026 |
Operational | — | 4 kW | Apr 1, 2026 |
|
OPTIMUS ENERGY CREEKS TRAVEL
Atmore, AL Reliability A Operational First tracked Apr 1, 2026 |
Operational | 115 kW | 500 kW | Apr 1, 2026 |
|
FOOTHILL-DEANZA DA LOT E STAT
Cupertino, CA
Operational First tracked Apr 2, 2026 |
Operational | — | 10 kW | Apr 2, 2026 |
|
LOVE'S 223 - CA #223 DC
Ripon, CA Reliability D Operational First tracked Apr 2, 2026 |
Operational | 142 kW | 375 kW | Apr 2, 2026 |
|
CITYOFMANASSAS COMMUNITY CTR
Manassas, VA
Operational First tracked Apr 2, 2026 |
Operational | — | 7 kW | Apr 2, 2026 |