Peterborough, ON
Average peak power unavailable
7 kW maximum
First tracked Feb 14, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Peterborough, ON
Average peak power unavailable
7 kW maximum
First tracked Feb 14, 2026
Kentville, NS
Average peak power unavailable
10 kW maximum
First tracked Feb 14, 2026
Richmond, BC
Average peak power unavailable
7 kW maximum
First tracked Feb 14, 2026
Bois-des-Filion, QC
Average peak power unavailable
200 kW maximum
First tracked Feb 14, 2026
North Miami Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Feb 16, 2026
Tallahassee, FL
Average peak power unavailable
19 kW maximum
First tracked Feb 16, 2026
Morristown, TN
Average peak power unavailable
12 kW maximum
First tracked Feb 16, 2026
Oakland, CA
Average peak power unavailable
7 kW maximum
First tracked Feb 16, 2026
Sacramento, CA
Average peak power unavailable
7 kW maximum
First tracked Feb 16, 2026
Elk Grove, CA
Average peak power unavailable
7 kW maximum
First tracked Feb 17, 2026
Beverly Hills, CA
Average peak power unavailable
7 kW maximum
First tracked Feb 17, 2026
Dallas, TX
Average peak power unavailable
12 kW maximum
First tracked Feb 17, 2026
Boulder, CO
Average peak power unavailable
7 kW maximum
First tracked Feb 17, 2026
Mendota Heights, MN
Average peak power unavailable
7 kW maximum
First tracked Feb 17, 2026
Menlo Park, CA
Average peak power unavailable
7 kW maximum
First tracked Feb 17, 2026
Taylorsville, UT
79 kW avg peak
125 kW maximum
First tracked Feb 17, 2026
Woodbridge Township, NJ
Average peak power unavailable
7 kW maximum
First tracked Feb 17, 2026
Bellevue, WA
Average peak power unavailable
19 kW maximum
First tracked Feb 18, 2026
Bellevue, WA
Average peak power unavailable
8 kW maximum
First tracked Feb 18, 2026
Bellevue, WA
Average peak power unavailable
8 kW maximum
First tracked Feb 18, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
SENECA-NH SEN-YPQ
Peterborough, ON
Operational First tracked Feb 14, 2026 |
Operational | — | 7 kW | Feb 14, 2026 |
|
KENTVILLE TOYOT KT OUTSIDE
Kentville, NS
Operational First tracked Feb 14, 2026 |
Operational | — | 10 kW | Feb 14, 2026 |
|
WEST CHARGER STATION 5
Richmond, BC
Operational First tracked Feb 14, 2026 |
Operational | — | 7 kW | Feb 14, 2026 |
|
RECHARGECO BOIS-FILION 01
Bois-des-Filion, QC
Operational First tracked Feb 14, 2026 |
Operational | — | 200 kW | Feb 14, 2026 |
|
FPL EVOLUTION NMB LIBRARY
North Miami Beach, FL
Operational First tracked Feb 16, 2026 |
Operational | — | 7 kW | Feb 16, 2026 |
|
FLEET PFC07
Tallahassee, FL
Operational First tracked Feb 16, 2026 |
Operational | — | 19 kW | Feb 16, 2026 |
|
GUZMAN PROP EV
Morristown, TN
Operational First tracked Feb 16, 2026 |
Operational | — | 12 kW | Feb 16, 2026 |
|
ESSEX ARTIZAN
Oakland, CA
Operational First tracked Feb 16, 2026 |
Operational | — | 7 kW | Feb 16, 2026 |
|
STATION
Sacramento, CA
Operational First tracked Feb 16, 2026 |
Operational | — | 7 kW | Feb 16, 2026 |
|
FRESENIUS BLDG CHARGER
Elk Grove, CA
Operational First tracked Feb 17, 2026 |
Operational | — | 7 kW | Feb 17, 2026 |
|
BEVERLY HILLS THIRD ST 1
Beverly Hills, CA
Operational First tracked Feb 17, 2026 |
Operational | — | 7 kW | Feb 17, 2026 |
|
HSD
Dallas, TX
Operational First tracked Feb 17, 2026 |
Operational | — | 12 kW | Feb 17, 2026 |
|
FLATIRON I LLC STATION
Boulder, CO
Operational First tracked Feb 17, 2026 |
Operational | — | 7 kW | Feb 17, 2026 |
|
BUILDRENEWABLES BUILD RENEWABLE
Mendota Heights, MN
Operational First tracked Feb 17, 2026 |
Operational | — | 7 kW | Feb 17, 2026 |
|
SOFTBANK STATION 1
Menlo Park, CA
Operational First tracked Feb 17, 2026 |
Operational | — | 7 kW | Feb 17, 2026 |
|
STATE OF UTAH UDOT SOUTH L3
Taylorsville, UT Reliability B Operational First tracked Feb 17, 2026 |
Operational | 79 kW | 125 kW | Feb 17, 2026 |
|
ATLANTIC REALTY METROTOP PG
Woodbridge Township, NJ
Operational First tracked Feb 17, 2026 |
Operational | — | 7 kW | Feb 17, 2026 |
|
AMZ SEA119
Bellevue, WA
Operational First tracked Feb 18, 2026 |
Operational | — | 19 kW | Feb 18, 2026 |
|
AMZ SEA119
Bellevue, WA
Operational First tracked Feb 18, 2026 |
Operational | — | 8 kW | Feb 18, 2026 |
|
AMZ SEA119
Bellevue, WA
Operational First tracked Feb 18, 2026 |
Operational | — | 8 kW | Feb 18, 2026 |