Show Low, AZ
Average peak power unavailable
24 kW maximum
First tracked Feb 3, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Show Low, AZ
Average peak power unavailable
24 kW maximum
First tracked Feb 3, 2026
Paducah, KY
Average peak power unavailable
63 kW maximum
First tracked Feb 3, 2026
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Feb 4, 2026
Sanford, FL
Average peak power unavailable
125 kW maximum
First tracked Feb 4, 2026
Dublin, CA
Average peak power unavailable
8 kW maximum
First tracked Feb 4, 2026
Louisville, KY
Average peak power unavailable
7 kW maximum
First tracked Feb 4, 2026
Bridgewater, MA
Average peak power unavailable
7 kW maximum
First tracked Feb 4, 2026
Bridgewater, MA
Average peak power unavailable
7 kW maximum
First tracked Feb 4, 2026
Bridgewater, MA
Average peak power unavailable
7 kW maximum
First tracked Feb 4, 2026
Bridgewater, MA
Average peak power unavailable
7 kW maximum
First tracked Feb 4, 2026
Marshfield, MA
Average peak power unavailable
15 kW maximum
First tracked Feb 4, 2026
DeBary, FL
Average peak power unavailable
7 kW maximum
First tracked Feb 4, 2026
River Forest, IL
Average peak power unavailable
19 kW maximum
First tracked Feb 4, 2026
Ann Arbor, MI
129 kW avg peak
350 kW maximum
First tracked Feb 4, 2026
Seattle, WA
Average peak power unavailable
8 kW maximum
First tracked Feb 4, 2026
Yucaipa, CA
Average peak power unavailable
8 kW maximum
First tracked Feb 4, 2026
Marysville, OH
Average peak power unavailable
7 kW maximum
First tracked Feb 4, 2026
Portland, OR
Average peak power unavailable
19 kW maximum
First tracked Feb 4, 2026
Kooskia, ID
Average peak power unavailable
125 kW maximum
First tracked Feb 4, 2026
Denver, CO
78 kW avg peak
125 kW maximum
First tracked Feb 5, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
HT02038 ABB STATION 1
Show Low, AZ
Operational First tracked Feb 3, 2026 |
Operational | — | 24 kW | Feb 3, 2026 |
|
LARRY STOVESAND STATION 1
Paducah, KY
Operational First tracked Feb 3, 2026 |
Operational | — | 63 kW | Feb 3, 2026 |
|
UH EV STATION TECH BRIDGE RET
Houston, TX
Unknown First tracked Feb 4, 2026 |
Unknown | — | 7 kW | Feb 4, 2026 |
|
OPTIMUS CPO SEMINOLE PBLC
Sanford, FL
Operational First tracked Feb 4, 2026 |
Operational | — | 125 kW | Feb 4, 2026 |
|
CITY OF DUBLIN DUBLIN SPORTS 2
Dublin, CA
Operational First tracked Feb 4, 2026 |
Operational | — | 8 kW | Feb 4, 2026 |
|
LG&E HYATTHOUSEEAST
Louisville, KY
Operational First tracked Feb 4, 2026 |
Operational | — | 7 kW | Feb 4, 2026 |
|
BSU DMF UNIT 3
Bridgewater, MA
Unknown First tracked Feb 4, 2026 |
Unknown | — | 7 kW | Feb 4, 2026 |
|
BSU DMF UNIT
Bridgewater, MA
Operational First tracked Feb 4, 2026 |
Operational | — | 7 kW | Feb 4, 2026 |
|
BSU BSUWEY UNIT
Bridgewater, MA
Operational First tracked Feb 4, 2026 |
Operational | — | 7 kW | Feb 4, 2026 |
|
BSU TINSLEY UNIT 1
Bridgewater, MA
Operational First tracked Feb 4, 2026 |
Operational | — | 7 kW | Feb 4, 2026 |
|
QUIRK CHEVY NH
Marshfield, MA
Operational First tracked Feb 4, 2026 |
Operational | — | 15 kW | Feb 4, 2026 |
|
ALLURE OE ALLURE MAIN
DeBary, FL
Operational First tracked Feb 4, 2026 |
Operational | — | 7 kW | Feb 4, 2026 |
|
RIVER FOREST STATION
River Forest, IL
Operational First tracked Feb 4, 2026 |
Operational | — | 19 kW | Feb 4, 2026 |
|
L401 L3-EVPARKMB
Ann Arbor, MI Reliability A Operational First tracked Feb 4, 2026 |
Operational | 129 kW | 350 kW | Feb 4, 2026 |
|
KINECTS 144
Seattle, WA
Operational First tracked Feb 4, 2026 |
Operational | — | 8 kW | Feb 4, 2026 |
|
CHC CRAFTON ST
Yucaipa, CA
Operational First tracked Feb 4, 2026 |
Operational | — | 8 kW | Feb 4, 2026 |
|
COPPER1 STATION 1
Marysville, OH
Operational First tracked Feb 4, 2026 |
Operational | — | 7 kW | Feb 4, 2026 |
|
LIFT UP STATION ONE
Portland, OR
Operational First tracked Feb 4, 2026 |
Operational | — | 19 kW | Feb 4, 2026 |
|
GRANGEVILLE KOOSKIA
Kooskia, ID
Operational First tracked Feb 4, 2026 |
Operational | — | 125 kW | Feb 4, 2026 |
|
QT CHARGERS 4246 STATION 2
Denver, CO Reliability B Operational First tracked Feb 5, 2026 |
Operational | 78 kW | 125 kW | Feb 5, 2026 |