Toledo, OH
Average peak power unavailable
63 kW maximum
First tracked Dec 24, 2025
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Toledo, OH
Average peak power unavailable
63 kW maximum
First tracked Dec 24, 2025
Countryside, IL
Average peak power unavailable
63 kW maximum
First tracked Dec 24, 2025
Phoenix, AZ
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Phoenix, AZ
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Monterey, TN
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Raleigh, NC
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Waterbury, CT
Average peak power unavailable
7 kW maximum
First tracked Dec 24, 2025
Miramar Beach, FL
Average peak power unavailable
8 kW maximum
First tracked Dec 25, 2025
Pittsfield, MA
Average peak power unavailable
8 kW maximum
First tracked Dec 25, 2025
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Dec 25, 2025
Richland, WA
Average peak power unavailable
7 kW maximum
First tracked Dec 25, 2025
Richland, WA
Average peak power unavailable
7 kW maximum
First tracked Dec 25, 2025
Portage la Prairie, MB
Average peak power unavailable
7 kW maximum
First tracked Dec 25, 2025
Pontiac, MI
Average peak power unavailable
19 kW maximum
First tracked Dec 25, 2025
Oakville, ON
186 kW avg peak
500 kW maximum
First tracked Dec 25, 2025
Brockport, NY
Average peak power unavailable
7 kW maximum
First tracked Dec 25, 2025
Syracuse, NY
Average peak power unavailable
13 kW maximum
First tracked Dec 25, 2025
Rochester, NY
Average peak power unavailable
10 kW maximum
First tracked Dec 25, 2025
Geneseo, NY
Average peak power unavailable
10 kW maximum
First tracked Dec 25, 2025
Brockport, NY
Average peak power unavailable
7 kW maximum
First tracked Dec 25, 2025
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
BROWNHONDA STATION 1
Toledo, OH
Operational First tracked Dec 24, 2025 |
Operational | — | 63 kW | Dec 24, 2025 |
|
HYUNDAI COUNTRY GERALD HY
Countryside, IL
Operational First tracked Dec 24, 2025 |
Operational | — | 63 kW | Dec 24, 2025 |
|
SIHI BLDG 4
Phoenix, AZ
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
SIHI BLDG 4 - 7
Phoenix, AZ
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
SOUTHWIND SOUTHWIND
Monterey, TN
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
RAY AT THE WELD
Raleigh, NC
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
UCONN WATERBURY GARG
Waterbury, CT
Operational First tracked Dec 24, 2025 |
Operational | — | 7 kW | Dec 24, 2025 |
|
MIRAMAR BCH HP STATION
Miramar Beach, FL
Operational First tracked Dec 25, 2025 |
Operational | — | 8 kW | Dec 25, 2025 |
|
HIEXPITTSFIELD HIEXPITTSFIELD
Pittsfield, MA
Operational First tracked Dec 25, 2025 |
Operational | — | 8 kW | Dec 25, 2025 |
|
DOUBLETREEBOSSB STATION
Boston, MA
Operational First tracked Dec 25, 2025 |
Operational | — | 7 kW | Dec 25, 2025 |
|
ICCU RICH-22
Richland, WA
Operational First tracked Dec 25, 2025 |
Operational | — | 7 kW | Dec 25, 2025 |
|
ICCU RICH-22-4
Richland, WA
Unknown First tracked Dec 25, 2025 |
Unknown | — | 7 kW | Dec 25, 2025 |
|
BROADSTREET DUFFERIN
Portage la Prairie, MB
Operational First tracked Dec 25, 2025 |
Operational | — | 7 kW | Dec 25, 2025 |
|
OAKLAND COUNTY EVSE-0
Pontiac, MI
Operational First tracked Dec 25, 2025 |
Operational | — | 19 kW | Dec 25, 2025 |
|
PETRO-CANADA CP 33755
Oakville, ON Reliability A Operational First tracked Dec 25, 2025 |
Operational | 186 kW | 500 kW | Dec 25, 2025 |
|
COLL BROCKPORT ALLEN LOOP
Brockport, NY
Operational First tracked Dec 25, 2025 |
Operational | — | 7 kW | Dec 25, 2025 |
|
LOFTS AT 1117 PARKING LOT
Syracuse, NY
Operational First tracked Dec 25, 2025 |
Operational | — | 13 kW | Dec 25, 2025 |
|
HOTEL LOCATION TOWN PLACE
Rochester, NY
Operational First tracked Dec 25, 2025 |
Operational | — | 10 kW | Dec 25, 2025 |
|
RW GENESEO POOL HOUSE 2
Geneseo, NY
Operational First tracked Dec 25, 2025 |
Operational | — | 10 kW | Dec 25, 2025 |
|
COLL BROCKPORT UNION LOTO
Brockport, NY
Operational First tracked Dec 25, 2025 |
Operational | — | 7 kW | Dec 25, 2025 |