24,257
Sites
83
Avg peak power

See your own charging sessions

Link your Rivian account to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

RI OER RING JFHQ 5

East Greenwich, RI

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 11, 2025

RI OER COLT STATE PARK

Bristol, RI

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 11, 2025

MHA DOUGLAS 16

East Lyme, CT

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 11, 2025

RI OER BLD61 DLT ST

Cranston, RI

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 11, 2025

RI OER RING JFHQ

East Greenwich, RI

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 11, 2025

GCC- CLUBHOUSE

Greenwich, CT

Operational

Average peak power unavailable

19 kW maximum

First tracked Nov 11, 2025

YALE 63

New Haven, CT

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 11, 2025

SUNY WCC LOT10 STATION

Valhalla, NY

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 11, 2025

BADGER BADGER

Pawtucket, RI

Operational

Average peak power unavailable

10 kW maximum

First tracked Nov 11, 2025

CHOATE 1 AND 2 FACILITIES

Wallingford, CT

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 11, 2025

GPM INVESTMENTS 307 DC

Waterbury, CT

Operational Reliability A

99 kW avg peak

160 kW maximum

First tracked Nov 11, 2025

NOURIA RAYNHAM

Raynham, MA

Operational Reliability C

85 kW avg peak

180 kW maximum

First tracked Nov 11, 2025

BRYANT LOT F

Smithfield, RI

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 11, 2025

Page 1049 of 1213