Normal, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Normal, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Champaign, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Danville, IL
Average peak power unavailable
7 kW maximum
First tracked Nov 3, 2025
Tucson, AZ
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Hialeah, FL
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Hollister, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
El Mirage, AZ
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Alma, NE
Average peak power unavailable
13 kW maximum
First tracked Nov 4, 2025
Fredericksburg, VA
Average peak power unavailable
12 kW maximum
First tracked Nov 4, 2025
Charlottesville, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Fairfax, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
Fredericksburg, VA
Average peak power unavailable
19 kW maximum
First tracked Nov 4, 2025
Harrisonburg, VA
173 kW avg peak
200 kW maximum
First tracked Nov 4, 2025
Lake Ridge, VA
Average peak power unavailable
7 kW maximum
First tracked Nov 4, 2025
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
HCC CHARGING ST ACEC
Normal, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
FDC, LLC STATION 3
Champaign, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
ILLINI CHARGING CONF CNTR 02
Champaign, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
CARLE FOUNDATIO CATR ASC 2
Danville, IL
Operational First tracked Nov 3, 2025 |
Operational | — | 7 kW | Nov 3, 2025 |
|
LOFT CINEMA SOUTH CHARGER
Tucson, AZ
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
METRO GRANDE I CHARGER
Hialeah, FL
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
HOLLISTER-PW COH STATION 1
Hollister, CA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
MICROSOFT PHX86-0
El Mirage, AZ
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
HARVARD GULCH
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
CCD CHARGING JUSTICE CENTER
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
CCD CHARGING ACME LOT
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
DPAC GARAGE 2 PERFRMNG ARTS 2
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
CCD CHARGING BANNOCK LOT 1
Denver, CO
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
CITY OF ALMA ALMA BAY 1/2
Alma, NE
Operational First tracked Nov 4, 2025 |
Operational | — | 13 kW | Nov 4, 2025 |
|
USPA AFPQO000001JHLT
Fredericksburg, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 12 kW | Nov 4, 2025 |
|
PVCC
Charlottesville, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
FAIRFAX COUNTY MONUMENT PG
Fairfax, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |
|
PUBLISHER
Fredericksburg, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 19 kW | Nov 4, 2025 |
|
HWY81TRUCKSTOP POWER LINK 1
Harrisonburg, VA Reliability A Operational First tracked Nov 4, 2025 |
Operational | 173 kW | 200 kW | Nov 4, 2025 |
|
WLR STATION 1 WLR EV
Lake Ridge, VA
Operational First tracked Nov 4, 2025 |
Operational | — | 7 kW | Nov 4, 2025 |