ChargePoint
B+30,850
Sites
80
Avg kW
Reliability Distribution
A: 2%
B: 2%
C: 1%
Sites
Hopkinton, RI
163kW avg
63kW max
Warwick, RI
7kW max
Wilmington, MA
7kW max
Andover, MA
7kW max
Tewksbury, MA
7kW max
Wilmington, MA
7kW max
Billerica, MA
63kW max
Bedford, MA
7kW max
Billerica, MA
63kW max
Tewksbury, MA
7kW max
Tewksbury, MA
7kW max
Billerica, MA
7kW max
Wilmington, MA
7kW max
Tewksbury, MA
7kW max
Carlisle, MA
7kW max
Billerica, MA
7kW max
Tewksbury, MA
7kW max
Tewksbury, MA
7kW max
Wellesley, MA
15kW max
Waltham, MA
7kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| A | RI OER ASHAWAY (Hopkinton, RI) | 163 | 63 | 18 Jul | |
| RIOER RT117 P&R STN3 (Warwick, RI) | — | 7 | 18 Jul | ||
| 200 BOP BACK 1 (Wilmington, MA) | — | 7 | 18 Jul | ||
| 200 BOP BACK 2 (Andover, MA) | — | 7 | 18 Jul | ||
| INNOVATION DR BUILDING 400 (Tewksbury, MA) | — | 7 | 18 Jul | ||
| 200 BOP FRONT (Wilmington, MA) | — | 7 | 18 Jul | ||
| METTLER TOLEDO EV CHARGER #2 (Billerica, MA) | — | 63 | 18 Jul | ||
| BEDFORD-EVS LANE SCH 2024 (Bedford, MA) | — | 7 | 18 Jul | ||
| METTLER TOLEDO EV CHARGER #1 (Billerica, MA) | — | 63 | 18 Jul | ||
| TEWKSBURY TOWN HALL (Tewksbury, MA) | — | 7 | 18 Jul | ||
| TEWKSBURY (Tewksbury, MA) | — | 7 | 18 Jul | ||
| THE VAL (Billerica, MA) | — | 7 | 18 Jul | ||
| BGO US CORE 800 RESRCH EV (Wilmington, MA) | — | 7 | 18 Jul | ||
| INNOVATION DR BUILDING 200 (Tewksbury, MA) | — | 7 | 18 Jul | ||
| CARLISLE CPS (Carlisle, MA) | — | 7 | 18 Jul | ||
| NATIONAL GRID BILLERICA 99 (Billerica, MA) | — | 7 | 18 Jul | ||
| TEWKSBURY LIBRARY (Tewksbury, MA) | — | 7 | 18 Jul | ||
| NATIONAL GRID 99 TEWKSBURY (Tewksbury, MA) | — | 7 | 18 Jul | ||
| WELLESLEYS WABAN LOT3 (Wellesley, MA) | — | 15 | 18 Jul | ||
| MA PORTFOLIO HOBBS STATION (Waltham, MA) | — | 7 | 18 Jul |