ChargePoint
B+23,870
Sites
81
Avg kW
Reliability Distribution
A: 2%
B: 3%
C: 1%
Sites
Madras, OR
63kW avg
63kW max
Klamath Falls, OR
7kW max
Klamath Falls, OR
69kW avg
63kW max
Klamath Falls, OR
69kW avg
63kW max
Klamath Falls, OR
55kW avg
63kW max
Klamath Falls, OR
7kW max
Truckee, CA
7kW max
Fresno, CA
7kW max
Fresno, CA
7kW max
Fresno, CA
7kW max
Fresno, CA
7kW max
Fresno, CA
7kW max
Fresno, CA
7kW max
Madera, CA
7kW max
Fresno, CA
56kW avg
63kW max
Fresno, CA
57kW avg
63kW max
Fresno, CA
7kW max
Parlier, CA
7kW max
Selma, CA
59kW avg
63kW max
Fresno, CA
7kW max
| Location | Status | Avg kW | Max kW | Added ↑ | |
|---|---|---|---|---|---|
| C | PACIFIC POWER MADRAS (Madras, OR) | 63 | 63 | — | |
| OREGON TECH OT STATION (Klamath Falls, OR) | — | 7 | — | ||
| B | PACIFIC POWER K-FALLS (Klamath Falls, OR) | 69 | 63 | — | |
| B | PACIFIC POWER K-FALLS DCFC 4 (Klamath Falls, OR) | 69 | 63 | — | |
| A | PACIFIC POWER K-FALLS DCFC 1 (Klamath Falls, OR) | 55 | 63 | — | |
| PBOC STATION 1 (Klamath Falls, OR) | — | 7 | — | ||
| TOWNOFTRUCKEE TRUCKEE EV (Truckee, CA) | — | 7 | — | ||
| CAL PAIN EV CPC (Fresno, CA) | — | 7 | — | ||
| SPRUCE-1 SPOC EV (Fresno, CA) | — | 7 | — | ||
| SPRUCE-1 SPOC EV1 (Fresno, CA) | — | 7 | — | ||
| CITY OF FRESNO WOODWRKPRKCHG (Fresno, CA) | — | 7 | — | ||
| CITY OF FRESNO WOODWRKPRKCHG (Fresno, CA) | — | 7 | — | ||
| FRESNO STATE P2 (Fresno, CA) | — | 7 | — | ||
| VCH MOB EV3 (Madera, CA) | — | 7 | — | ||
| A | DC CORRIDOR RIVER PARK (Fresno, CA) | 56 | 63 | — | |
| B | DC CORRIDOR RIVER PARK DC1 (Fresno, CA) | 57 | 63 | — | |
| LARK AT COPPER BLDG 3 (Fresno, CA) | — | 7 | — | ||
| GUARDSHACK PARKINGLOT (Parlier, CA) | — | 7 | — | ||
| A | BUBBLE WASH I (Selma, CA) | 59 | 63 | — | |
| DICICCOS SHDARM STATION 1 (Fresno, CA) | — | 7 | — |