Baytown, TX
Average peak power unavailable
400 kW maximum
First tracked Aug 11, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Baytown, TX
Average peak power unavailable
400 kW maximum
First tracked Aug 11, 2026
Houston, TX
Average peak power unavailable
150 kW maximum
First tracked Aug 11, 2026
San Antonio, TX
Average peak power unavailable
400 kW maximum
First tracked Aug 11, 2026
El Paso, TX
Average peak power unavailable
400 kW maximum
First tracked Aug 11, 2026
Eloy, AZ
Average peak power unavailable
400 kW maximum
First tracked Aug 11, 2026
Stanwood, WA
Average peak power unavailable
150 kW maximum
First tracked Aug 1, 2026
Ann Arbor, MI
Average peak power unavailable
400 kW maximum
First tracked Aug 1, 2026
McHenry, IL
Average peak power unavailable
150 kW maximum
First tracked Jul 31, 2026
Crystal Lake, IL
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2026
Third Lake, IL
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2026
Joliet, IL
Average peak power unavailable
150 kW maximum
First tracked Jul 31, 2026
Springfield, NJ
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2026
Summit, IL
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2026
Bellwood, IL
Average peak power unavailable
150 kW maximum
First tracked Jul 31, 2026
Marysville, CA
Average peak power unavailable
150 kW maximum
First tracked Jul 31, 2026
New Hyde Park, NY
Average peak power unavailable
7 kW maximum
First tracked Jul 31, 2026
Nashville, TN
Average peak power unavailable
150 kW maximum
First tracked Jul 31, 2026
Salt Lake City, UT
Average peak power unavailable
400 kW maximum
First tracked Jul 31, 2026
Livingston, CA
Average peak power unavailable
400 kW maximum
First tracked Jul 31, 2026
Antioch, CA
Average peak power unavailable
100 kW maximum
First tracked Jul 31, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
2096 TA Thompson Road, Baytown, TX
Baytown, TX
Operational First tracked Aug 11, 2026 |
Operational | — | 400 kW | Aug 11, 2026 |
|
1001 Gigahub Katy Freeway, Houston, TX
Houston, TX
Operational First tracked Aug 11, 2026 |
Operational | — | 150 kW | Aug 11, 2026 |
|
2057 TA I-10 East, San Antonio, TX
San Antonio, TX
Operational First tracked Aug 11, 2026 |
Operational | — | 400 kW | Aug 11, 2026 |
|
2012 TA Horizon Boulevard, El Paso, TX
El Paso, TX
Operational First tracked Aug 11, 2026 |
Operational | — | 400 kW | Aug 11, 2026 |
|
2064 TA N Sunland Gin Road, Eloy, AZ
Eloy, AZ
Operational First tracked Aug 11, 2026 |
Operational | — | 400 kW | Aug 11, 2026 |
|
3058 ARCO 104th Drive NW, Stanwood, WA
Stanwood, WA
Operational First tracked Aug 1, 2026 |
Operational | — | 150 kW | Aug 1, 2026 |
|
1085 Gigahub Briarwood Circle, Ann Arbor, MI
Ann Arbor, MI
Operational First tracked Aug 1, 2026 |
Operational | — | 400 kW | Aug 1, 2026 |
|
3018 Thorntons IL-120, McHenry, IL
McHenry, IL
Unknown First tracked Jul 31, 2026 |
Unknown | — | 150 kW | Jul 31, 2026 |
|
3126 Thorntons, Tek Dr, Crystal Lake, IL
Crystal Lake, IL
Operational First tracked Jul 31, 2026 |
Operational | — | 7 kW | Jul 31, 2026 |
|
3156 Thorntons, US-45, Third Lake, IL
Third Lake, IL
Operational First tracked Jul 31, 2026 |
Operational | — | 7 kW | Jul 31, 2026 |
|
3163 Thorntons Collins Street, Joliet, IL
Joliet, IL
Operational First tracked Jul 31, 2026 |
Operational | — | 150 kW | Jul 31, 2026 |
|
3010 bp, Meisel Ave, Springfield, NJ
Springfield, NJ
Operational First tracked Jul 31, 2026 |
Operational | — | 7 kW | Jul 31, 2026 |
|
3133 Thorntons, Harlem Ave, Summit, IL
Summit, IL
Operational First tracked Jul 31, 2026 |
Operational | — | 7 kW | Jul 31, 2026 |
|
Thorntons 25th Avenue, Bellwood, IL
Bellwood, IL
Operational First tracked Jul 31, 2026 |
Operational | — | 150 kW | Jul 31, 2026 |
|
3087 ARCO E Street, Marysville, CA
Marysville, CA
Operational First tracked Jul 31, 2026 |
Operational | — | 150 kW | Jul 31, 2026 |
|
3009 bp, Jericho Turnpike, New Hyde Park, NY
New Hyde Park, NY
Operational First tracked Jul 31, 2026 |
Operational | — | 7 kW | Jul 31, 2026 |
|
3025 Thorntons 2815 Lebanon Pike, Nashville, TN
Nashville, TN
Operational First tracked Jul 31, 2026 |
Operational | — | 150 kW | Jul 31, 2026 |
|
1059 Gigahub SLC S 2400 W, Salt Lake City, UT
Salt Lake City, UT
Operational First tracked Jul 31, 2026 |
Operational | — | 400 kW | Jul 31, 2026 |
|
2095 TA Winton Parkway, Livingston, CA
Livingston, CA
Operational First tracked Jul 31, 2026 |
Operational | — | 400 kW | Jul 31, 2026 |
|
3067 ARCO, W 10th St, Antioch, CA
Antioch, CA
Operational First tracked Jul 31, 2026 |
Operational | — | 100 kW | Jul 31, 2026 |