EV Connect
DGS Lot 43, Building 054
updated
DGS Lot 43, Building 054
1616 Capitol Ave, Sacramento, CA 95814, USA
7.2 kW
Max Power
✅
Always Open
Details
Energy
0.17 USD per kWh
Parking (While not charging)
1.5 USD per hour After 30 mins of grace Period
Parking (While plugged in)
Free
Chargers
BTC1584 DGS Lot 43, Building 054
J1772 7.2 kW ⚡️⚡️
BTC1584 DGS Lot 43, Building 054
J1772 7.2 kW ⚡️⚡️
BTC1585 DGS Lot 43, Building 054
J1772 7.2 kW ⚡️⚡️
BTC1585 DGS Lot 43, Building 054
J1772 7.2 kW ⚡️⚡️
BTC1584 DGS Lot 43, Building 054
J1772 7.2 kW ⚡️⚡️
BTC1584 DGS Lot 43, Building 054
J1772 7.2 kW ⚡️⚡️
BTC1585 DGS Lot 43, Building 054
J1772 7.2 kW ⚡️⚡️
BTC1585 DGS Lot 43, Building 054
J1772 7.2 kW ⚡️⚡️