Auburn, AL
Average peak power unavailable
600 kW maximum
First tracked Dec 21, 2024
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Auburn, AL
Average peak power unavailable
600 kW maximum
First tracked Dec 21, 2024
Birmingham, AL
Average peak power unavailable
600 kW maximum
First tracked Mar 25, 2026
Tempe, AZ
Average peak power unavailable
400 kW maximum
First tracked Jun 16, 2026
Abbotsford, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 22, 2026
Coquitlam, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 22, 2026
Coquitlam, BC
192 kW avg peak
400 kW maximum
First tracked Feb 14, 2026
Nanaimo, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 22, 2026
Pentiction, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 22, 2026
Pitt Meadows, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 22, 2026
Squamish, BC
Average peak power unavailable
400 kW maximum
First tracked Sep 22, 2026
Surrey, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 22, 2026
Surrey, BC
208 kW avg peak
400 kW maximum
First tracked Jan 12, 2026
Tsawwassen, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 22, 2026
Tsawwassen, BC
203 kW avg peak
400 kW maximum
First tracked Feb 13, 2026
Water, BC
Average peak power unavailable
400 kW maximum
First tracked Jun 24, 2026
Long Beach, CA
Average peak power unavailable
400 kW maximum
First tracked Jun 24, 2026
Long Beach, CA
Average peak power unavailable
600 kW maximum
First tracked Dec 5, 2024
Long Beach, CA
Average peak power unavailable
600 kW maximum
First tracked Mar 25, 2026
Red Bluff, CA
Average peak power unavailable
600 kW maximum
First tracked Mar 26, 2026
Thornton, CO
Average peak power unavailable
600 kW maximum
First tracked Oct 30, 2025
| Location ↑ | Status | Avg peak power | Max power | First tracked |
|---|---|---|---|---|
|
Bucees Auburn MB.HPC
Auburn, AL
Operational First tracked Dec 21, 2024 |
Operational | — | 600 kW | Dec 21, 2024 |
|
The Summit Birmingham MB.HPC
Birmingham, AL
Operational First tracked Mar 25, 2026 |
Operational | — | 600 kW | Mar 25, 2026 |
|
Tempe Marketplace
Tempe, AZ
Operational First tracked Jun 16, 2026 |
Operational | — | 400 kW | Jun 16, 2026 |
|
Abbotsford Power Centre MB.HPC
Abbotsford, BC
Operational First tracked Jun 22, 2026 |
Operational | — | 400 kW | Jun 22, 2026 |
|
Sunwood Square MB.HPC
Coquitlam, BC
Operational First tracked Jun 22, 2026 |
Operational | — | 400 kW | Jun 22, 2026 |
|
Sunwood Square MB.HPC
Coquitlam, BC Reliability A Operational First tracked Feb 14, 2026 |
Operational | 192 kW | 400 kW | Feb 14, 2026 |
|
Woodgrove Shopping Centre MB.HPC
Nanaimo, BC
Operational First tracked Jun 22, 2026 |
Operational | — | 400 kW | Jun 22, 2026 |
|
Penticton Lakeside Hotel MB.HPC
Pentiction, BC
Operational First tracked Jun 22, 2026 |
Operational | — | 400 kW | Jun 22, 2026 |
|
Meadow Vale Shopping Centre MB.HPC
Pitt Meadows, BC
Operational First tracked Jun 22, 2026 |
Operational | — | 400 kW | Jun 22, 2026 |
|
Squamish MB.HPC
Squamish, BC
Unknown First tracked Sep 22, 2026 |
Unknown | — | 400 kW | Sep 22, 2026 |
|
Panorama Village Surrey MB.HPC
Surrey, BC
Operational First tracked Jun 22, 2026 |
Operational | — | 400 kW | Jun 22, 2026 |
|
Panorama Village Surrey MB.HPC
Surrey, BC Reliability B Operational First tracked Jan 12, 2026 |
Operational | 208 kW | 400 kW | Jan 12, 2026 |
|
Tsawwassen Mills MB.HPC
Tsawwassen, BC
Operational First tracked Jun 22, 2026 |
Operational | — | 400 kW | Jun 22, 2026 |
|
Tsawwassen Mills MB.HPC
Tsawwassen, BC Reliability B Operational First tracked Feb 13, 2026 |
Operational | 203 kW | 400 kW | Feb 13, 2026 |
|
NOT FOR PUBLIC USE - TEST LAB
Water, BC
Operational First tracked Jun 24, 2026 |
Operational | — | 400 kW | Jun 24, 2026 |
|
NOT FOR PUBLIC USE - TEST LAB
Long Beach, CA
Operational First tracked Jun 24, 2026 |
Operational | — | 400 kW | Jun 24, 2026 |
|
NOT FOR PUBLIC USE - TEST LAB
Long Beach, CA
Operational First tracked Dec 5, 2024 |
Operational | — | 600 kW | Dec 5, 2024 |
|
LATC Not For Public HYC-400
Long Beach, CA
Operational First tracked Mar 25, 2026 |
Operational | — | 600 kW | Mar 25, 2026 |
|
Starbucks Red Bluff MB.HPC
Red Bluff, CA
Operational First tracked Mar 26, 2026 |
Operational | — | 600 kW | Mar 26, 2026 |
|
The Grove Thornton MB.HPC
Thornton, CO
Operational First tracked Oct 30, 2025 |
Operational | — | 600 kW | Oct 30, 2025 |